About OKUMA LB2000 EXII MC accuracy
The resources or workpieces are put in between two electrodes, the very best, and base electrodes. Depending on the G code, the pc instructs the level of electrical discharge that need to be made by the electrodes.001 slower than calculated feed going in, software total feed rate going again out) to adjust the feed charge sum by to enable the fauce